{"id":358,"date":"2023-04-27T11:01:06","date_gmt":"2023-04-27T09:01:06","guid":{"rendered":"https:\/\/teciman.difadi.net\/?p=358"},"modified":"2024-01-29T12:08:48","modified_gmt":"2024-01-29T11:08:48","slug":"success-in-the-construction-of-a-high-speed-line","status":"publish","type":"post","link":"https:\/\/www.teciman.com\/outsourcing\/en\/news\/success-in-the-construction-of-a-high-speed-line\/","title":{"rendered":"Success in the construction of a high-speed line"},"content":{"rendered":"<p><a href=\"https:\/\/www.linkedin.com\/showcase\/teciman-ingenieria\/about\/?viewAsMember=true\" target=\"_blank\" rel=\"noopener noreferrer\">Teciman<\/a>\u00a0collaborates in the\u00a0<strong>construction of<\/strong>\u00a0a\u00a0<strong>high speed line<\/strong>\u00a0in Asturias providing technical office management, quality and environmental management of the superstructure.<\/p>\n<p>The client, a joint venture of leading companies in the railway sector, trusts T\u00e9ciman to integrate specialized engineers who meet the specifications of the end client. The process of\u00a0<strong>incorporation<\/strong>\u00a0has been done\u00a0<strong>in less than 3 weeks<\/strong>, thanks to the excellent work of the T\u00e9ciman team.<\/p>\n<p>The section assigned to the client is the construction of a\u00a0<strong>superstructure<\/strong>\u00a0with the aim of saving the orography, avoiding geographical accidents... and of course, serving as a base for the other companies in the project to proceed with the installation of tracks, catenaries, substations...<\/p>\n<p>From the\u00a0<strong>Technical office<\/strong>\u00a0They monitor all the activities necessary for the development of the project:\u00a0<em>Monthly certifications, KPI evolution, cost control, materials, machinery, labor and subcontractors<\/em>\u2026 He\u00a0<a href=\"https:\/\/www.outsourcingteciman.com\/outsourcing-de-ingenieria\/\" target=\"_blank\" rel=\"noopener noreferrer\">T\u00e9ciman engineering team<\/a>\u00a0It also collaborates in topographic, geotechnical and modified studies.<\/p>\n<p>The area of\u00a0<strong>Quality and Environment<\/strong>\u00a0elaborates\u00a0<em>Quality Plans<\/em>\u00a0and\u00a0<em>Points Programs<\/em>\u00a0Inspection to verify compliance with the specifications of the load book. They carry out periodic tests of materials such as concrete, rebar... as well as a<em>\u00a0Environmental Management Plan<\/em>\u00a0to act accordingly.<\/p>\n<p>A\u00a0<strong>success story<\/strong>\u00a0which is reflected in the\u00a0<strong>continuity<\/strong>And that is what has happened in this project in which, after this collaboration, T\u00e9ciman continues to contribute its engineering capabilities to the different companies involved.<\/p>\n<p>For more information about our experiences in this and other sectors, contact us through the\u00a0<a href=\"http:\/\/www.outsourcingteciman.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">T\u00e9ciman website (www.outsourcingteciman.com), <\/a>by email at teciman@teciman.com or by phone at 947209141.<\/p>","protected":false},"excerpt":{"rendered":"<p>T\u00e9ciman is collaborating in the construction of a high-speed line in Asturias, providing technical office, quality, and environmental management for the superstructure. The client, a joint venture of leading companies in the railway sector, entrusted T\u00e9ciman with the integration of specialized engineers who meet the end client&#039;s specifications. The onboarding process was completed in less than three weeks, thanks to the [\u2026]<\/p>","protected":false},"author":2,"featured_media":4260,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-358","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/posts\/358","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/comments?post=358"}],"version-history":[{"count":1,"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/posts\/358\/revisions"}],"predecessor-version":[{"id":4075,"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/posts\/358\/revisions\/4075"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/media\/4260"}],"wp:attachment":[{"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/media?parent=358"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/categories?post=358"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teciman.com\/outsourcing\/en\/wp-json\/wp\/v2\/tags?post=358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}