{"id":324,"date":"2022-11-24T12:05:59","date_gmt":"2022-11-24T11:05:59","guid":{"rendered":"https:\/\/teciman.difadi.net\/?p=324"},"modified":"2024-01-23T12:52:56","modified_gmt":"2024-01-23T11:52:56","slug":"photovoltaic-plant","status":"publish","type":"post","link":"https:\/\/www.teciman.com\/metrologia\/en\/news\/photovoltaic-plant\/","title":{"rendered":"New project: development of a photovoltaic plant in Italy"},"content":{"rendered":"<p><a href=\"https:\/\/www.linkedin.com\/company\/teciman-internacional\/mycompany\/verification\/?viewAsMember=true\" target=\"_blank\" rel=\"noopener\"><strong>Teciman<\/strong><\/a> collaborates in the <strong>comprehensive development<\/strong> of a <strong>20 MW photovoltaic plant<\/strong> in Italy for a leading renewable energy client.<\/p>\n<p>Our <a href=\"https:\/\/www.metrologiateciman.com\/outsourcing-de-ingenieria\/\" target=\"_blank\" rel=\"noopener\">engineering team<\/a>, formed by <a href=\"https:\/\/www.metrologiateciman.com\/outsourcing-de-ingenieria\/#Actividad\" target=\"_blank\" rel=\"noopener\"><strong>Civil, Electrical and HSEQ Engineers<\/strong> (Quality, Safety, Health and Environment),<\/a> participates in all phases of the project; from pre-design, detailed design and drafting of the project, to the start-up of the solar park.<\/p>\n<p>The project begins with the <strong>layout<\/strong> from the solar plant. Continue with the <strong>detailed writing<\/strong> of the aspects of <strong>civil works<\/strong> (earthmoving, excavation, fencing, trenches, foundations, etc.), <strong>definition of structures<\/strong> for solar panels (with or without single or dual axis trackers) and <strong>design of electrical installations<\/strong> from the photovoltaic plant. The energy is evacuated through the power line to the nearest substation.<\/p>\n<p>Our engineers then carry out the <strong>on-site management and supervision<\/strong> of the complete execution of the photovoltaic park project: civil works, installation of the facilities and panels, compliance with the Quality and Prevention Plan, monitoring of subcontractors, start-up, etc.<\/p>\n<p>T\u00e9ciman adds this collaboration to a wide range of experiences in the energy sector, such as <em>the supervision and development of a wind farm in southern Spain, compliance with the HSEQ Quality Plan of another solar park in France, quality control of wind turbine elements for one of the largest manufacturers, etc.<\/em>.<\/p>","protected":false},"excerpt":{"rendered":"<p>T\u00e9ciman is collaborating on the comprehensive development of a 20 MW photovoltaic plant in Italy for a leading renewable energy client. Our engineering team, comprised of civil, electrical, and HSEQ (Health, Safety, and Environmental) engineers, is involved in all phases of the project, from pre-design, detailed design, and drafting of the contract.<\/p>","protected":false},"author":2,"featured_media":325,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-324","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/posts\/324","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/comments?post=324"}],"version-history":[{"count":1,"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/posts\/324\/revisions"}],"predecessor-version":[{"id":4065,"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/posts\/324\/revisions\/4065"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/media\/325"}],"wp:attachment":[{"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/media?parent=324"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/categories?post=324"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teciman.com\/metrologia\/en\/wp-json\/wp\/v2\/tags?post=324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}