{"id":4908,"date":"2024-03-04T10:10:18","date_gmt":"2024-03-04T09:10:18","guid":{"rendered":"https:\/\/www.teciman.com\/?p=4908"},"modified":"2024-10-22T12:17:27","modified_gmt":"2024-10-22T10:17:27","slug":"migration-automation-advantages","status":"publish","type":"post","link":"https:\/\/www.teciman.com\/ingenieria\/en\/news\/migration-automation-advantages\/","title":{"rendered":"Migration and Industrial Automation, advantages and operation"},"content":{"rendered":"<p><strong>Industrial Automation<\/strong> <strong>increases efficiency and reduces costs in production<\/strong>. However, many control systems are outdated and need to be updated to remain competitive. This is where the Migration of automation systems takes place.<\/p>\n<p>In addition, the Migration also allows the integration of new electrical control elements and drives, which contributes to increasing the energy efficiency of the plant and reducing operating costs.<\/p>\n<p>Migrating an automation system does not have to intervene directly in the facilities and processes that are in use. That is to say<strong>, the company continues to operate while the entire improvement and updating process is developed<\/strong>.<\/p>\n<p>In this article, we will talk about the different aspects involved in migrating an automation system, from the basic concepts to the specific steps to migrate a STEP 7 project to TIA Portal.<\/p>\n<p>&nbsp;<\/p>\n<h1><span class=\"TextRun SCXW112161922 BCX0\" lang=\"ES-ES\" xml:lang=\"ES-ES\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW112161922 BCX0\">What is an automation systems migration?<\/span><span class=\"NormalTextRun SCXW112161922 BCX0\">?<\/span><\/span><span class=\"EOP SCXW112161922 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/h1>\n<p><span data-contrast=\"auto\">Automation Systems Migration is the process of modernizing an obsolete automation system. This can be done through a retrofit, which is updating the system components and software, or through a complete migration to a new system.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The objective of Migration is<strong> increase efficiency, reduce operating costs, improve process quality and accuracy, and increase plant safety<\/strong>.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Instead of investing in a completely new system, Migration allows you to take advantage of existing infrastructure while updating and integrating it with new control elements.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">It is a detailed process that includes the design and integration of PLC programming, the electrical integration of new control elements and drives, the installation and integration into the industrial network, the migration of HMI screens, the factory commissioning, the migration of OT architecture, industrial communication protocols...<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">This strategy, in addition to being profitable, minimizes the impact on production and reduces plant downtime.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h1>What is a PLC migration?<\/h1>\n<p><span data-contrast=\"auto\">A PLC (Programmable Logic Controller) is a programmable electronic device used in industrial automation systems to<strong> control processes and machinery<\/strong>.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">PLCs are an essential part of industrial automation, and many automation systems depend on them for their operation.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">PLC Migration is a process that involves changing an obsolete programmable controller for a more updated model.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">It is necessary when old models are no longer compatible with new systems and have been discontinued or simply cannot handle the current workload. Next-generation technologies such as wireless communication or the integration of intelligent systems or IIoT can also be implemented.<\/span><\/p>\n<h2>How is a PLC migration performed?<\/h2>\n<p><span data-contrast=\"auto\">The PLC Migration process involves several phases:<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<ol>\n<li><span data-contrast=\"auto\"><strong>Previous analysis<\/strong>: It is necessary to carry out a detailed study of the system that you want to migrate, analyzing the system architecture, the devices and components that are used, the software that is being used and the communication protocols.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Planning<\/strong>: Deadlines, necessary resources, work team must be established and the migration procedure defined.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Design<\/strong>: of the new system architecture by selecting the new components and devices to be used and establishing the new communications.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Unwiring and hardware wiring<\/strong>- Unwiring the old hardware and rewiring the new hardware.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>PLC software conversion<\/strong>: You must carry out the conversion from the old to the new and check that it has been done correctly and that the new software meets the system requirements.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Commissioning and testing<\/strong>- Testing is necessary to verify that everything is working correctly.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Documentary writing<\/strong>: All steps carried out in the migration must be documented for future reference of the system, including: plans, diagrams, diagrams and manuals.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ol>\n<h2>How to migrate a project from STEP 7 to TIA portal?<\/h2>\n<p><span data-contrast=\"auto\">It is the conversion of the existing STEP 7 project to TIA portal, the latest automation platform. <em>Siemens<\/em> that offers a <strong>greater efficiency and flexibility<\/strong>. Below are the steps to follow in the migration:<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559685&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<ol>\n<li><span data-contrast=\"auto\">Make a backup copy of the original project in STEP 7.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Create a new project in TIA Portal and select the \u201cimport\u201d option in the file menu.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Select the project file generated by STEP 7 and follow the instructions of the import wizard.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Verify that all project elements, such as function blocks, programs, and configurations, have been imported correctly.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Perform a complete review of the project in TIA Portal to verify that everything is working correctly.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Perform necessary testing and adjustments to ensure that the project works optimally.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ol>\n<p><span data-contrast=\"auto\">It is important to note that migration can be complex and requires advanced knowledge in PLC programming and the use of TIA Portal software.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559685&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\"> \u00a0<\/span><span data-contrast=\"auto\">For this reason, it is advisable to have the help of industrial automation specialists to guarantee the success of the migration project.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559685&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<h1>Advantages of migrating your automation system<\/h1>\n<ul>\n<li><span data-contrast=\"auto\">Improvement in efficiency and productivity.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Reduces operating costs.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Optimization of production processes.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Improving the energy efficiency of the plant.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Less downtime, thanks to the new automatons.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">More consistent, precise and higher quality production.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Increases plant safety.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h1>T\u00e9ciman and Industrial Automation<span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/h1>\n<p><span data-contrast=\"auto\">In <a href=\"https:\/\/www.ingenieriateciman.com\/proyectos-ingenieria\/automatizacion-industrial\/\" target=\"_blank\" rel=\"noopener\">Teciman<\/a> We provide our clients with tools to manage their facilities in a close and friendly way.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\"><strong>We customize control systems<\/strong> to improve productivity and efficiency in industrial environments, automating all types of processes.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Thanks to the latest generation technologies we can <strong>control and monitor industrial processes<\/strong>, using tools from leading brands such as <em>Siemens, Rockwell, Omron, Schneider Electric<\/em>\u2026. Through <strong>own developments<\/strong> Our engineers implement programs that guarantee optimal operation.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Can <strong>digitize any line phase<\/strong> and represent the most important variables of the process through visual tools such as<em> HMI, SCADA Systems <\/em>and<em> DCS<\/em>.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\"><strong>We design and implement industrial communication networks<\/strong> under different communication protocols such as<em> Ethernet\/IP, PROFINET, DeviceNet, PROFIBUS, CANOpen, EtherCat, MODBUS\u2026<\/em><\/span><em>\u00a0<\/em><\/p>\n<p><span data-contrast=\"auto\">We have extensive experience in <strong>updating and optimizing obsolete automata<\/strong>, making modifications to any type of automated systems, adapting them to the client&#039;s needs.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p>Consult in detail our capabilities in the <a href=\"https:\/\/www.ingenieriateciman.com\/proyectos-ingenieria\/automatizacion-industrial\/\" target=\"_blank\" rel=\"noopener\">Web<\/a> and contact us by phone <a class=\"contact-link\" href=\"tel:+34947209141\">947 20 91 41<\/a>\u00a0and mail <a class=\"contact-link\" href=\"mailto:teciman@teciman.com\">teciman@teciman.com<\/a> . We tell you about our projects on LinkedIn: <a href=\"https:\/\/www.linkedin.com\/company\/teciman-internacional\/mycompany\/verification\/?viewAsMember=true\" target=\"_blank\" rel=\"noopener\">Teciman International<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Industrial Automation increases efficiency and reduces costs in production. However, many control systems are outdated and need to be updated to remain competitive. This is where the Migration of automation systems takes place. In addition, the Migration also allows the integration of new electrical control elements and drives, which contributes [\u2026]<\/p>","protected":false},"author":2,"featured_media":4909,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[46],"tags":[],"class_list":["post-4908","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articulos-de-interes"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/posts\/4908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/comments?post=4908"}],"version-history":[{"count":7,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/posts\/4908\/revisions"}],"predecessor-version":[{"id":5853,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/posts\/4908\/revisions\/5853"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/media\/4909"}],"wp:attachment":[{"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/media?parent=4908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/categories?post=4908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/tags?post=4908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}