{"id":267,"date":"2021-09-20T07:34:14","date_gmt":"2021-09-20T05:34:14","guid":{"rendered":"https:\/\/teciman.difadi.net\/?p=267"},"modified":"2024-01-23T12:52:42","modified_gmt":"2024-01-23T11:52:42","slug":"teciman-develops-control-network-for-new-production-line","status":"publish","type":"post","link":"https:\/\/www.teciman.com\/ingenieria\/en\/news\/teciman-develops-control-network-for-new-production-line\/","title":{"rendered":"T\u00e9ciman develops a control network for a new production line"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-4616 aligncenter\" src=\"https:\/\/www.ingenieriateciman.com\/wp-content\/uploads\/2021\/09\/Propuesta1-300x147.png\" alt=\"\" width=\"442\" height=\"216\" title=\"\"><\/p>\n<p>T\u00e9ciman performs the <a href=\"https:\/\/www.ingenieriateciman.com\/outsourcing-de-ingenieria\/\" target=\"_blank\" rel=\"noopener\">development, programming, implementation and start-up<\/a> of a <strong>control network<\/strong> for one <strong>new production line<\/strong>. Within the line there are 8 different zones, which makes its management difficult. The network is made up of 8 PLCs of <a href=\"https:\/\/www.ingenieriateciman.com\/metrologia-3d\/software-de-medicion\/\" target=\"_blank\" rel=\"noopener\">Siemens<\/a> with SCADA connected to the main ERP and the production MES system.<\/p>\n<p>The work is developed as <strong>closed package<\/strong> with two phases: the first at T\u00e9ciman&#039;s facilities and the second, the implementation of the control network, at the client&#039;s facilities. The flexibility that characterizes T\u00e9ciman allows adaptation to <a href=\"https:\/\/www.ingenieriateciman.com\/\" target=\"_blank\" rel=\"noopener\">Any type of project, format and client<\/a>.<\/p>\n<p>In this second stage, connectivity tests, security and signal checks, as well as variable tables, are carried out. During the implementation, we work together with professional HW and wiring installers to verify the correct integration of the control system with the client&#039;s ERP and MES.<\/p>\n<p>Client-server programming of the <strong>SCADA<\/strong> is done in SIMATIC WinCC (<strong>Aunt Portal<\/strong>) V16, configuring the platform on VM (Virtual Machine) with a single physical server connected to a SQL database for integration with the client&#039;s ERP.<\/p>\n<p>Thanks to these SCADAs, the new production areas of the plant can be controlled. All the necessary information is available to be able to interact with the installation, receiving all the necessary alarm signals, such as inlet and outlet temperatures, pump pressure, etc.<\/p>\n<p>This is a clear example of the efficiency of the <a href=\"https:\/\/www.ingenieriateciman.com\/outsourcing-de-ingenieria\/\" target=\"_blank\" rel=\"noopener\"><strong>engineering services in outsourcing format<\/strong>,<\/a> since they provide a tailor-made solution without having to increase a client&#039;s internal structure. This work format results in the highest possible performance in a given<a href=\"https:\/\/www.linkedin.com\/company\/teciman-internacional\/mycompany\/verification\/?viewAsMember=true\" target=\"_blank\" rel=\"noopener\"> activity<\/a> industrial.<\/p>","protected":false},"excerpt":{"rendered":"<p>T\u00e9ciman develops, programs, implements, and commissions a control network for a new production line. The line has eight distinct zones, making it difficult to manage. The network is comprised of eight Siemens PLCs with SCADA connected to the main ERP and the production MES system.<\/p>","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-267","post","type-post","status-publish","format-standard","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/posts\/267","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/comments?post=267"}],"version-history":[{"count":1,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/posts\/267\/revisions"}],"predecessor-version":[{"id":4044,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/posts\/267\/revisions\/4044"}],"wp:attachment":[{"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/media?parent=267"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/categories?post=267"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teciman.com\/ingenieria\/en\/wp-json\/wp\/v2\/tags?post=267"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}